Portfolio

Capture-4-1200x799.png

Waelz Sustainable Products

New Construction

Labor and Equipment for New Construction

 

New construction project for a Waelz kiln facility including:

  • Steel erection
  • Equipment installation
  • Maintenance and start-up services
canstockphoto34989540-1200x720.jpg

Public Power in Kentucky

Coal to Gas Conversion Project

Coal to Gas Conversion Project

  • Replacement of primary superheat outlet header and pendants
  • Installation of new fuel gas piping, new burner racks, and new burners, as well as other miscellaneous piping and balance of plant equipment
  • Demolition of unneeded coal piping and ductwork
canstockphoto-10018533-1200x800.jpg

Indiana Power Generating Station

Commissioning & Start Up

Labor and Equipment for New Construction

New construction project including:

  • Doosan heat recovery steam generator units
  • Structural steel
  • Ductwork
  • Ammonia system piping
  • Complete electrical installation
  • Condenser and auxiliary steam boiler
  • Commissioning and start-up
canstockphoto22635552-1200x800.jpg

Ohio Energy Project

Combined Cycle Power Plant

700 MW Combined Cycle Power Plant Grassroots Project

  • Natural gas fired
  • General Electric 7FA Combustion Turbines (CTG)
  • CMI Heat Recovery Steam Generators (HRSG)
  • General Electric Steam Turbine Gernerator (STG)
  • SPIG air cooled condenser – 25 cell
  • CTGs and HRSGs outdoor, STG indoor
  • Greenfield site
canstockphoto22635540-1200x831.jpg

Kansas Energy Center

Power Plant Improvements

Air Quality Control System Upgrade Project

Consisting of the field assembly and installation of the following:

  • New flue gas duct work
  • Major mechanical equipment
  • VFD controlled centrifugal induced fans
  • Fabric filter installation
  • Absorber module modifications and supporting super structures
  • Installation of related process piping, instrumentation, and electrical heat tracing, insulation, and lagging
  • Tie in of new equipment during scheduled outages
  • Installation of new fly ash handling equipment and upgrades to the electrostatic precipitator
canstockphoto11049439-1200x800.jpg

Indiana Power Plant

Mechanical Installation

Mechanical Installation of FGDs

  • Ductwork
  • Structural steel
  • Equipment setting/installation
  • BOP piping system & sprinkler piping installation
  • Total structural steel = 7,773 tons
  • Total large bore pipe = 49,180 linear feet
  • Total small bore pipe = 32,199 linear feet
canstockphoto30107194-1200x800.jpg

Illinois Energy Campus Exotic Alloy

Exotic Alloy

Erection of Wet Electrostatic Precipitator

Installation of two stainless 2205 Alloy Wet Electrostatic Precipitators (WESP) including:

  • Spray piping
  • Inlet and outlet duct
  • Internals
  • Access platforms
  • Wet electrostatic precipitator and associated ductwork

Traylor Construction Group

A construction partnership like no other – above ground or below, on land or in water.

About Us

Sterling Industrial, LLC. is an Equal Opportunity Employer and all qualified applicants will receive consideration for employment without regard to race, color, religion, national origin, veteran status, sex, sexual orientation, gender identity, age, genetic information, pregnancy, disability, protected activity, or other non-merit factors.